From: route@monster.com
Sent: Friday, April 08, 2016 12:11 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: p6 PMP
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Stephen G. Francis Box 1213 Andrews,
North Carolina 28901 sgf.1899@gmail.com
- 910.728.7267 Feb. 2015
– Jan.2016: Thyssen Krupp Industrial Solutions Position:
EPC Lead Scheduler (Contractual) Location:
Atlanta, Ga. & Buzzi Cement Plant, Maryneal, Tx. Duties:
Tracking Buzzi Cement Plant expansion Project. Working toward building a
Universal WBS for Atlanta Division to integrate with the International plans.
Working with P6.2 / rev.8 / and MS Project, built, integrated sub-contractors
schedules and tracking progress. Oct. 2014
– Dec. 2014: Day & Zimmerman Position:
Project Controls Scheduler (Contractual) Location:
Mississippi Power Company; Plants (Watson, Daniel) Duties:
Verify Outage Schedules in P6 client version created by MPC to D&Z
Estimates. Worked with Team Members (MPS Planners/Schedulers and D&Z
Estimator, Site Superintendents creating Resource and Man-power loaded
Schedules; prepare Earned Value Reports for Tracking. Feb. 2013
- Sept. 2014: CB&I (Chicago Bridge and Iron) Position:
Lead Project Controls Scheduler Location:
Regional Fossil Division Office; Goodyear, Az. Duties:
working in P-6.2 & 8.2 client version. Develop WBS, cost and resource loaded
schedules, created Earned Value reports for
Capital & Contracted O&M Projects; Covering 6 Gas and Oil Plants.
Working with team members (e.g. Estimators, EPC, Stakeholders, & Project
and Site Managers) to obtain goals set and exceed Project Controls
expectations. Apr. 2012
– Jan. 2013: Contractual with Shaw Group, Baton Rouge, La.: Position:
Lead Project Controls Scheduler Location:
Regional Fossil Division Office; Goodyear, Az.; West Phoenix Power Plant, Red
Hawk Power Plant, Saguaro Power Plant, Sundance Power Plant, Yuma Power Plant
and Cholla Power Plant. Duties:
Creating, WBS resource loaded Project Schedules; (e.g. Cooling Tower,
Manifold Cleaning, Sodium Hypochlorite Project & Chemical Feed System,
Aux Boiler and Forecast Projects thru 2015). Tracking current Schedule;
analyzing, evaluating, and forecasting current status against the established
Baseline Schedule (Earned Value Analysis). Participating in Team efforts
building Estimates for Capital, Construction Outages and Maintenance
Schedules. Aug. 2011
– Dec.2011 Contractual with Enerfab, Cincinnati, Oh TVA –
Cumberland City, Tn. & AEP Cardinal Plant, Brilliant, Oh. Position:
Project Scheduler Duties:
Assisted in creating and expanding Enerfabs’ Boiler, Bottom Ash, Air Heater,
and Secondary Super Heat Construction Schedules. Expanded and
Processed current schedules for tracking; analyzed, evaluated, and
forecast current status against the established baseline schedule (Earned
Value Analysis). Assess the impact(s) of changes and schedule slippages.
Worked closely with Enerfab Project Management, to maintain Project Goals and
formulate the status of the project, communicated with a wide variety of
technical professionals. Jul. 2010
– Jul.2011 Residential Projects - Contract Manager -
Reconstruction Victorian Home site in North Carolina. Coordinating efforts
in renovation a home-site in N.C. to National Historical
Sufficiency. 2009 –
Jun. 2010 Contractual with American Electric Power, Fulton, AR. John W.
Turk, Jr. Project $1.85b Super Critical Fossil Fuel Project (on-site) Position: Lead Primavera (6.2) on-site Scheduler for AEP. Imported
Monthly: Transmission and Distribution, Off-Site Rail and EPC Schedules for
Baseline and Milestone analysis; reported deviations to Project and Site
Management. Imported and tracked weekly fragnets of the Construction
Schedules. Created analysis and variance reports for PM on a weekly and monthly
basis. Created specific layouts for each project coordinator to track their
disciplines in the field. Maintained open and harmonious communications with
the EPC Contractor and AEP’s Boiler Contractor. Continued working with the
Engineering Schedule as Construction started and progressed. 2007 –
2008 Contractual with American Electric Power, Columbus, OH. John W. Turk, Jr. Project $1.85b Super Critical Fossil Fuel Project
(corporate office) Position: Lead Engineering Scheduler Primavera (5.5) Maintained Engineering
Schedule. Imported monthly EPC Schedule created Baseline Schedules analyzed
and reported schedule variances to Project Management. Tracked and analyzed
deviations in the Engineering Schedule daily. Maintained open communication
with the EPC contractor for solutions to Engineering ad hoc review
deviations. Basic duties: Work with
the development of Critical Path Schedules that are resource and cost loaded ·
Develop a detailed Milestone schedule · Progress
current schedules in accordance with client contractual requirements · Analyze,
evaluate, and forecast current Schedule against an established Baseline
Schedule · Assess
the impact(s) of changes and slippages · Maintain
an Integrated Master Project Schedule that includes multiple schedules and
inner-dependencies · Work
closely with Project management team in setting monitoring project goals and
analyzing the status of projects · Communicate
with a wide variety of technical professionals 2006 Self Employed – Scheduler, Construction & Safety Consulting
for Oil / Gas and Electrical Industry (fossil fuel) and Individual Tax
Consultant. 2005 Fall Outage – Position: Scheduler Primavera (P3) Contractual
for Shaw/Stone and Webster, Big Cajun II Fossil Fuel Plant, New Roads, La. Created, maintained Schedule for New Roads Generation Fall Outage.
Schedule was hourly based, multi calendar, resource loaded for Boiler Outage
and Cooling Tower Maintenance. EDUCATION: MSHA Training 2015 Professional Management Institute: Professional Project Management
(PMP) course. (2014) University of North Carolina at Greensboro: B.S. (Economics, Bus.
Admin., Accounting) (1983) Texas A&M University - Texas Engineering Extension 501 O.S.H.A.
Outreach Training (2003) Medic First Responder and CPR Course (2003) Scheduling Extension Course - PRIMAVERA 3.1 (2001) O.S.H.A. General Industry Safety & Health (2001) Mid-West Generation Joliet - MIMS and Lotus Notes Software Training
(2001) Petroleum Education Counsel, Inc. - Petroleum and Safety Awareness
(1997) |
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
|